BIOLOGICAL TREATMENT PLANT OF NORTHERN KYNOURIA
Complete construction of a Wastewater Treatment Plant in Northern Kynouria, located in Astros. The facility serves a population of 20,000 people. The treatment method is based on a prolonged aeration system with complete stabilization of the sludge, featuring biological denitrification and biological phosphorus removal. This project includes construction, industrial, electromechanical works and installations, as well as wastewater treatment and purification. It is an environmentally significant project for the entire region.
Design and construction on a turnkey basis.
The project was funded by the 3rd Community Support Framework (CSF).
Construction period: 2007 – 2009
Project authority: Region of Peloponnese.